|

|
The Eastman
Chemical Company contracted with MPC to wrap approximately
two miles of underground process and sewer pipes of
varying diameters at its facility in the City of Rotterdam
in the Netherlands. We developed a technique for wrapping
the pipes with polyurethane coated PetroGard VIII liner
material, and welding them closed.
MPC has applied its wrapping technique to other installations,
including applications where piping runs through contaminated
areas. The wrapping protects a product or commodity,
such as water, as it moves through the pipes. SPCC rule
40cfr112 requires pipes carrying petroleum or other
oil products in certain areas have such secondary spill
containment systems. |